What Are The Foundation Requirements Before The Steel Structure Is Installed
News 2022-06-14
First, the steel structure before the installation of the foundation should do a good job of axis measurement, support surface elevation, the level of the foundation support surface inspection, foot bolts and the length of the extension of the support surface of the weight side and so on. Before installation should be repeated testing and re-measurement, in line with the following requirements after the handover acceptance procedures, can



Scan the QR code and add WeChat